10 | 5 | 1 | 319-25-015 | Forms | 08/04/2025 12:31 PM | Approved |
| |
Question: Can NDOT please provide the forms referenced in Appendix C, Section 2.4.2, pg. 16 of the RFP? |
Answer: Please see forthcoming addendum. |
|
11 | 5 | 2 | 319-25-015 | Request the list of Risks, opportunities...etc not subject to page count. | 08/11/2025 03:27 PM | Approved |
| |
Question: QUESTION: Will NDOT please consider changing this section to read:
2.4.3 Subfactor 2: Description of how the Proposer will integrate risk management strategies and procedures for identifying, tracking, costing, and mitigating or eliminating project risk and maximizing opportunities (i.e., innovations or Project-specific unique ideas). This subsection is to include the Proposer’s preliminary list of risks, opportunities/innovations, and/or challenges, alongside potential mitigation strategies specific to the Project. THE LIST OF RISKS, OPPORTUNITIES/INNOVATION, AND/OR CHALLENGES ALONGSIDE POTENTIAL MITIGATION STRATEGIES SPECIFIC TO THE PROJECT WILL NOT GO TOWARD THE 25-PAGE COUNT, OR BE INCLUDED AS AN APPENDIX.
This will allow teams to further expand on strategies to help with the Project. |
Answer: The Proposal page limit will be increased by five (5) pages to now be a total of thirty (30) pages. See revisions to Section 2.4.3 and Section 3.2 in a forthcoming addendum (to be released on or before August 26, 2025). |
|
12 | 5 | 3 | 319-25-015 | Key Personnel vs Value-Added Staff and Bios | 08/11/2025 03:27 PM | Approved |
| |
Question: Scoring of Key Personnel and Bios (page 18-19) states: 2.4.3. Proposal Content/Evaluation Factors, Subfactor #2:
• Up to four (4) other people that the Proposer considers key to the success of the Project’s preconstruction and construction phases (Proposer value-added staff)
QUESTION: Are the “Up to four (4) other people that the proposer considers key to the success of the preconstruction and construction phases (Proposer value-added staff)” also required to have a biography like the bio required for the Key Personnel? |
Answer: Yes. When proposed, the Department will also consider these individuals Key Personnel. |
|
13 | 5 | 4 | 319-25-015 | Assumed Quantities in the Sample Estimate | 08/11/2025 03:27 PM | Approved |
| |
Question: Cost Model on page 20-21. 2.4.4. Proposal Attachments:
The Proposer is to include a unit price and itemization of estimated costs that sum to that unit price for the following sample bid items and quantities.
QUESTION: Due to the project’s size and complexity, will NDOT please consider increasing the assumed quantity to realistic value (i.e. 50,000 cubic yards of roadway ex AND 50,000 tons of plant mix bituminous surface)? |
Answer: The intent of this item is to demonstrate how the Proposer shows transparency through its cost estimating process. Quantities and dollar values are not evaluated and will remain unchanged. |
|
14 | 5 | 5 | 319-25-015 | Clarification of form FDA | 08/11/2025 03:27 PM | Approved |
| |
Question: In the Forms Attachment in Addendum 1, Form FDA, Line 1, states:
1. From the first line – (To be signed by all PDB Team’s Designers that will be signing and sealing final design plans). This would give the impression that anyone who will be stamping plans as engineers of record (EOR’s) would need to sign the form.
QUESTION: Will NDOT please provide clarification on exactly who needs to sign the form?
Proposed Language Change: Change Form FDA first line in Parenthesis to: (To be signed by a single designated signer from each of the PDB design Team firms. (i.e. 1 signed form for company A, 1 signed form from company B, 1 signed form from company C, etc.) |
Answer: The lead design firm and all related professional service providers (notably all Engineers of Record) shall execute separate Form FDAs for inclusion with the Proposal. |
|
15 | 5 | 6 | 319-25-015 | Forms | 08/12/2025 09:24 AM | Approved |
| |
Question: Can NDOT please provide clarification or instruction on Form IC & Form BOC. Are these to be signed only by the proposer or also by Designer of Record and/or subconsultant firms? |
Answer: Form IC only needs to be signed by the Proposer (or all members of a joint venture). Assuming the question is referring to Form BC (as there is not a Form BOC), this form only needs to be signed by the Proposer (or all members of a joint venture). |
|
16 | 5 | 7 | 319-25-015 | 2.4.3 Evaluation Factor#1, Subfactor #3 | 08/13/2025 07:13 AM | Approved |
| |
Question: Can NDOT clarify if a "completed project" means design and construction? Or will design completion suffice for the Lead Designer projects? |
Answer: "Completed" is related to the services provided. For a design firm, completion of design services is acceptable. For a contractor, "completion" means completion of the related construction work or completion of a project to the point of substantial completion. |
|
17 | 5 | 8 | 319-25-015 | 2.3 Submission and Format Requirements, item 1.B | 08/13/2025 07:13 AM | Approved |
| |
Question: This item discusses distinct headings preceding the sections. Will NDOT clarify if these distinct headings can also be a cover page and/or divider pages? If so will these cover/divider pages count towards the 25-page limit? |
Answer: NDOT does not prefer the use of cover/divider pages to break up the sections. As noted in the RFP, distinct headings that clearly call out each section (to orient the reader) are required. |
|
18 | 5 | 9 | 319-25-015 | Proposal Page Limit | 08/14/2025 03:33 PM | Approved |
| |
Question: During the 8/13 pre-bid meeting, it was proposed to increase the proposal page limit from 25 to 30 pages. Fisher prefers to keep the limit at 25 pages. When will NDOT confirm the final page limit for the proposal? We need this information as soon as possible, as the proposal deadline is approaching. |
Answer: The Proposal page limit will be increased by five (5) pages to now be a total of thirty (30) pages. See revisions to Section 2.4.3 and Section 3.2 in a forthcoming addendum (to be released on or before August 26, 2025). |
|
19 | 5 | 10 | 319-25-015 | Page Limit | 08/14/2025 03:43 PM | Approved |
| |
Question: The Proposer requests that the page limit specified in 2.4.3 Proposal Content/Evaluation Factors be changed from twenty-five (25) pages to thirty (30) pages to allow sufficient space to thoroughly address the evaluation factors and project-specific requirements detailed in the RFP. |
Answer: The Proposal page limit will be increased by five (5) pages to now be a total of thirty (30) pages. See revisions to Section 2.4.3 and Section 3.2 in a forthcoming addendum (to be released on or before August 26, 2025). |
|
20 | 5 | 11 | 319-25-015 | DTM Files | 08/18/2025 12:55 PM | Approved |
| |
Question: We'd like to request the dtm files including all the inroads/micro-station roadway and earthwork electronic files. As a part of this request, any of the electronic model that can be converted to a Land XML to facilitate its use in Trimble Business Center would be deeply appreciated. |
Answer: Design files including mapping, surface (DTM), and design DGNs have been uploaded to the reference document folder. Conversion of the files is the responsibility of the Proposer. |
|
21 | 5 | 12 | 319-25-015 | Form COI | 08/18/2025 02:22 PM | Approved |
| |
Question: Question: Can NDOT please provide clarification or instruction on Form COI. Is this to be signed only by the proposer or also by Designer of Record and/or subconsultant firms? |
Answer: Only the Proposer needs to sign and submit this form. However, the form should document any relevant facts relating to past, present, or planned interest(s) of the undersigned’s team (including undersigned, all team members and their respective chief executives, directors, and all Key Personnel) that may result, or could be viewed as, an organizational conflict of interest in connection with this RFP. |
|
22 | 5 | 13 | 319-25-015 | Key Personnel Resumes | 08/18/2025 02:34 PM | Approved |
| |
Question: Section 2.4.4 states:
Resumes and references for all listed Key Personnel and Proposer value-added staff in Section 2.4.3 (Subfactor #2). The resumes for each Key Personnel or Proposer value-added staff are not to exceed one (1) page.
Will NDOT consider increasing the Resume page limit to 2 pages? |
Answer: The resume page limit will be increased to two (2) pages. See revisions to Section 2.4.4 in a forthcoming addendum (to be released on or before August 26, 2025). |
|
23 | 5 | 14 | 319-25-015 | 2.1, 2.5, &3.2 - Interview | 08/20/2025 07:52 AM | Approved |
| |
Question: Will NDOT provide the proposers the scoring results of the proposals prior to the interviews being conducted? When will proposal scores be released? |
Answer: The Department will not be releasing the scores from the proposals prior to interviews. Scoring will be released consistent with NDOT policy. |
|